Critical Chain project management software. Built with the man who invented Critical Chain.

Concerto is CCPM software that schedules every project in your organization against the people and equipment they share. Instead of padding each task, it pools safety time into a project buffer and tracks how fast that buffer is being used. Each team member gets one list: what to work on next. Managers see which projects are at risk while there is still time to act. Realization built Concerto in the late 1990s with Dr. Eliyahu Goldratt, the author of Critical Chain. Our customers report 25 to 50% shorter project timelines and 20 to 30% more throughput, often within 90 days.

Your projects aren't late because your people are slow

They're late because everyone is working on everything at once.

A typical organization starts projects as early as it can, keeps every resource 100% busy and pads every task estimate to be safe. It feels responsible. It produces the opposite: people jump between five projects, the padding gets used up by late starts and switching, and the critical work waits in a queue behind work that could have waited.

To solve traffic jams, you don't add more cars to the road. Concerto takes cars off the road.

How Concerto schedules a project

Concerto follows the Critical Chain method in five steps.

Step

What Concerto does

What changes for your teams

1. Focused durations

Cuts task estimates to the time the work takes without interruptions

Tasks stop expanding to fill the padding

2. Project buffer

Moves the safety time to the end of the project

The buffer protects the delivery date, not individual tasks

3. Critical chain

Finds the longest chain of tasks once both dependencies and resource availability count

No plan assumes a specialist is free when they aren't

4. Buffer tracking

Compares buffer used with work completed on every project

Managers act on real risk, early

5. Task priorities

Gives each person a ranked list of what to work on next

No more arguing about which project comes first

The difference from the critical path is step 3. The critical path ignores whether the people are available. The critical chain does not.

One schedule for every project you run

Scheduling one project well is the easy part. The real gains show up when every project sits on one schedule.

Concerto puts your whole portfolio on a single schedule, against the same engineers, mechanics, test rigs and hangar bays. New projects are released only when there's capacity to do them. The resource that limits the whole organization becomes visible, so you schedule everything around it. And when a customer asks for a date, you can give one based on actual capacity.

In 1999 Realization became the first company to bring multi-project, web-based scheduling to the world of projects. For the first time, an entire organization could work from one shared schedule in real time. That idea still drives Concerto today.

What our customers say

These results come from Realization customers, in their own words. They are what those organizations reported, not a promise.

"We had a 20% increase in just capacity alone. A 23% increase in engine production."

Gregory Mayes, General Manager, Delta Airlines

"We were able to see an 18% reduction in our cycle time. From a projected 17-month effort to finishing in 14 months."

Steven Pryor, Director, Spirit AeroSystems

"The first thing we saw is that per project, we can shorten the timeline by 20%."

Shalom Passy, Executive VP, Amdocs

Organization

Before

After

US Navy, Fleet Readiness Center Southeast (F-18)

6 aircraft a year, 36 in work

11 aircraft a year, 17 in work

Airbus Defence and Space

24 drawings a week, 41% engineering cost overrun

32 drawings a week, 6% overrun

ABB Cordoba

8-month engineering cycle, 85% on time

3-month cycle, 95% on time

BHP Billiton

Historical 2-week delays, 20% man-hour overruns

Finished 3 weeks early with 25% fewer man-hours

See all customer results

Who uses Concerto?

Concerto is used by organizations that run many projects on shared resources. Realization has worked with more than 350 organizations, including more than 25 aircraft MROs.

Maintenance, repair and overhaul

Aircraft, engine, ship and vehicle depots, where every extra day in the shop is a day the asset can't fly or sail. The Navy's F/A-18 depot increased throughput by 40% in its first year.

Engineering and new product development

Design offices and R&D teams where projects compete for the same specialists and test capacity. Airbus Defence and Space raised design throughput by 33%.

Construction and infrastructure

Plants, shipyards and capital projects with fixed dates and many contractors. BHP Billiton finished an iron ore development project three weeks early.

Where Concerto came from

It started with a book.

In 1991 our founder, Sanjeev Gupta, read The Goal by Eliyahu Goldratt and used its ideas to turn around a bottlenecked Xerox plant. In 1997 Goldratt sent Sanjeev the galleys of his next novel, Critical Chain, and the two talked about how software could make its ideas work in practice. When an aerospace and defense company asked Goldratt to help it run projects the Critical Chain way, he called Sanjeev. That project became Concerto.

Read our story

How a Concerto rollout works

Software on its own doesn't change how projects run. People do. So every Concerto rollout comes with Realization's implementation team.

1. We map your projects, your shared resources and your current bottleneck.

2. We load your projects into Concerto, set focused durations and buffers, and agree on how much work runs at once.

3. We train project managers, resource managers and team members to work from task priorities and buffer status.

4. We run weekly buffer reviews with you until the new way of working sticks.

Most customers see results within 90 days. The Navy's depots took about four months to get the plan moving.

Frequently asked questions

What is CCPM software?

CCPM software is project scheduling software that uses Critical Chain Project Management. It plans around resource availability, moves safety time into shared buffers and tracks buffer use to show which projects need attention.

What is the critical chain method in project management?

The critical chain is the longest sequence of dependent tasks once resource limits are included. The method protects that chain with one project buffer instead of padding each task, and limits how many projects run at the same time.

Who is Concerto for?

Concerto is for any organization where several projects compete for the same people or equipment. That can be a single maintenance depot or an enterprise portfolio of hundreds of projects.

Is there free CCPM software?

Some tools offer free trials or basic Critical Chain features. Organizations running many projects at once usually need multi-project scheduling, buffer management and help changing how teams work. That combination is what Concerto and Realization provide.

How long does it take to see results?

Realization customers often see results within 90 days.

If you can live with small improvements, you don't need us

If your goal is to finish far more projects, far faster, with the people you already have, let's talk.